Farr Company Facility Statistics |
|
Location |
5883 Robersonville
Products Road
Robersonville, NC 27872 |
| Lot Size |
33 Acres (Additional
acreage available) |
| Paved
Parking |
116 Marked Spaces |
| Unpaved
Parking |
35 Spaces (Total
spaces = 151) |
| Rail
Access |
1 rail siding with 1
dock door (12'x8') serviced by CSX. 1 drive-through door (12'x20') |
| Truck
Loading |
Total of thirteen
(13) docks including:
One (1) with rail spur
Five (5) 8'x8' doors with dock levelers
Seven (7) 8'x8' doors with no dock levelers |
| Zoning |
Not
Zoned |
| Taxes |
Year 2000 Real
Estate Taxes = $13,110.43 |
| Last
Use |
Rubbermaid Products |
| Architect |
Original: 1970
Butler Manufacturing Company
Addition: 1973 Marshall & Brown |
| Miscellaneous |
A 20,000 gallon
steel underground storage tank has been removed.
A 12,000 gallon steel underground
storage tank has been filled with concrete and sealed.
A new telephone system was recently
installed by Farr Company but will be removed by Farr Company and is NOT
included in this sale.
|
| Date
of Construction |
Original
Building: 1970
Addition: 1973 |
| Building
Size |
146,510 sq. feet;
single story, Butler building. |
| Building
Dimensions
|
Total of 146,510
sq. feet, consisting of:
Office: 31' x 210' = 6,510 sq. feet
Low Bay (Mfg.): 150' x 400' = 60,000 sq. feet
High Bay (Warehouse): 200' x 400' = 80,000 sq. feet. |
| Floors
|
6" concrete
slab on grade reinforced with 6x6 - 6/6 welded wire mesh on granular fill. |
|
Walls
|
3" thick 26 gauge painted
galvanized steel interior and exterior panels with fiberglass batt
insulation.
Brick veneer over 8" masonry block
walls at entrance and interior office locations |
|
Horizontal Wind Load |
25 PSF |
| Roof |
Low Bay & Office: 26
gauge Butler MR24 standing seam galvanized metal roof panels with 1
1/2" thick blanket insulation and vapor barrier below roof panels.
U
factor = .15.
High Bay: Sarnifill PVC single ply membrane
air insulation and original BUR.
Liveload on roof = 20 PSF. |
| Columns |
Typically 12" x 6 1/2"
or 14" x 6 3/4" steel columns spaced on 40' x 50' column lines. |
| Column Spacing |
40' x 50' |
|
Ceilings |
Galvanized metal
liner panels continuously line the underside of roof and insulation. |
|
Clear Ceiling Height |
80,000 sq. foot area: 23'6"
to 24'6" Clear
60,000 sq. foot area: 14'0" to 18'4" Clear |
| Offices |
6,510 square feet
including reception, private offices and lunch room. Interior finish
includes:
8 private offices with gypsum board walls.
5 have carpeted floors; 3 have tile floors. |
| Condition |
Excellent |
|
Lighting |
Interior:
Manufacturing Area - Fluorescent
Warehouse Area - High Intensity discharge
Exterior: Metal Halide |
| Heat |
Two (2) low
pressure steam boilers fired by propane gas. Low pressure steam heats the
building through a series of unit heaters and heating coils in the
manufacturing/warehouse area. |
| Air Conditioning |
One (1) 260 ton and
one (1) 455 ton electrical centrifugal chillers for
manufacturing/warehouse area.
Central systems cools office areas. |
| Humidification |
Steam
humidification is available to parts of the facility. |
| Ventilation |
Central fan units
circulate conditioned air throughout the manufacturing/warehouse areas. |
| Compressed Air
System |
One (1) 200 h.p.
and one (1) 75 h.p. air compressors serve the facility. 125 psi capacity. |
| Floor Drains |
Floor drains are
located throughout the manufacturing areas. |
| Toilet Facilities |
Plant Area: 3 Male,
3 Female
Office Area: 1 Male, 1 Female |
| Alarm |
Monitored by East
Coast Security, Dictograph - burglar and fire |
| Sprinklers |
Four (4) wet
sprinkler systems fed by 8" underground piping system which is
supplied by a thousand (1000)-gallon per minute diesel booster fire pump
rated at 85 psi. The fire pump takes suction from a 12" city water
main line along US Highways 64/13. Total water supply capacity to
the sprinkler systems and fire hydrants around building = approx. 1000 gpm
at 130 psi. |
|
Power |
Supplied
by Edgecombe - Martin EMC
277/480 volt, with 3000 KVA capacity |
|
Water |
Supplied
by Town of Robersonville. 12" main line located just outside
the property along US Highway 64/13. |
|
Sewer |
Supplied
by Town of Robersonville
8" line from building sanitary sewer to
treatment system. 6" line from mechanical equipment room to treatment
system. Pumped from treatment system to city sewer. |
|
Gas |
North Carolina Natural Gas (NCNG) |
-
Office
areas have been completely refurbished. New carpets, vinyl tile,
4" cove base molding. Two new office units added. new wallpaper
and paint. Replaced all office lighting and upgraded emergency
lighting. Replaced toilet and urinal partitions. New sinks, faucets,
shut-off valves and countertops. Repaired heating and air conditioning
systems. Repaired HVAC controls. New office furniture and partitions.
-
Replaced
and rewired front office outside lights and parking lot lights.
-
Painted
approximately 80,000 square feet of plant area ceiling with white
paint.
-
Refurbished
plant fluorescent lighting and pressure washed all shades.
-
Replaced
3/4 of warehouse lighting with 400 watt high pressure sodium high bay
fixtures.
-
Enclosed
4,700 square foot area in warehouse with concrete block from floor to
ceiling.
-
Installed SQ
DI Line 400 amp 480V bus duct. (Approx. 120 feet of duct)
-
Major repairs
on large chiller valves, control system and cooling tower. Chiller
converted to R-134 refrigerant and charged with 600 lbs. of freon.
Added oil cooler and changed compressor oil.
-
Two air
compressors have been serviced and oil filters changed. Replaced small
air compressor for HVAC system.
-
Replaced roof
ventilator motors and belts.
-
Major build
up of rear access road and drainage system.
-
Completely
rebuilt employee break room. New ceiling tile, floor tile, drywall,
lights, paint, moldings and doors.
-
Built new
plant production office approx. 1600 square feet with separate 5 ton
heat pump.
-
Shipping
office and first aid station were painted, new lights and floor tile.
-
Plant
restrooms have new toilets and urinal partitions, sinks, faucets,
countertops and shut off valves.
(Information
supplied by Ed Sager of Farr Company on 8-7-00.) |
C. B. Richard Ellis
Exclusive Representative of the
Farr Company Facility |
|